PermitPilot Capability // UCI

    Utility coordination is the silent killer of construction schedules.

    A project can have its building permit issued and still sit dark for months waiting on a transformer. Our team runs Utility Coordination Intelligence (UCI), part of PermitPilot™, Commun-ET's proprietary operated service layer, treating utility coordination as a structured, observable pipeline that removes the opacity behind cascading delays. AI does the pattern recognition. Our people do the judgment.

    P50 / P90
    Energization confidence intervals
    10 stages
    Tracked from load planning to meter set
    1 of 1
    Proprietary AI infrastructure for utility coordination in America
    Engineering Certainty

    Engineering certainty for your project's most critical path.

    Four differentiators that separate UCI from traditional 'call and wait' coordination.

    Predictive Schedule Impact Engine

    Probability-weighted P50 and P90 energization dates based on real-time utility performance and equipment lead times, not the dates utilities quote.

    Cross-Utility Conflict Hunter

    Reconciled geospatial data across electric, gas, water, and telecom catches a gas line intersecting a transformer vault in design, not during excavation.

    Long-Lead Equipment Tracker

    Real-time production and shipping status for transformers, switchgear, and regulators with weekly automated check-ins to prevent order drift.

    Inspector Whisperer & Meter Choreography

    Electronic release tracking between jurisdictional inspectors and utility scheduling, plus hour-by-hour meter-set day choreography for the GC and electrician.

    The Intelligence Pipeline

    Ten stages, observable end-to-end.

    Every utility project moves through these stages, UCI tracks each one with agent telemetry, SLA timers, and stakeholder accountability.

    1. Stage 01
      Project Initiation & Load Planning
    2. Stage 02
      Pre-application Engagement
    3. Stage 03
      Formal Service Application
    4. Stage 04
      Class of Service Determination
    5. Stage 05
      Customer Drawings & Switchgear Approval
    6. Stage 06
      Easements & Right-of-Way
    7. Stage 07
      CIAC Payment & Contract Execution
    8. Stage 08
      Construction & Installation
    9. Stage 09
      Inspection & Meter Release
    10. Stage 10
      Meter Set & Energization
    One of One

    The only platform in America with proprietary AI for utility coordination.

    We don't just expedite, we engineer certainty. Become a Commun-ET client to unlock UCI.

    Reserved for Commun-ET clients