Industry // 03
Energy & Utilities - from substation to renewables.
Substation, distribution, and renewables permitting with environmental review orchestration, built for the regulated and the developer side alike.
Sector Snapshot
2.4 GW
Renewables Permitted
45+
Substations & Switchyards
100%
NEPA Programs On Schedule
The Reality
Why energy permitting is its own discipline.
Energy projects sit at the intersection of land use, environmental review, utility regulation, and public engagement, frequently with state and federal jurisdictions stacked on top of municipal review. The cost of a single missed milestone is measured in lost interconnection queue position.
Stacked jurisdictions
Federal (FERC, BLM, USACE), state (PUC, environmental), and local approvals all run in parallel, sequencing is everything.
Environmental review
NEPA, CEQA, and state-level reviews can run 12-36 months and define the critical path.
Interconnection coupling
Construction, permitting, and utility interconnection schedules must converge, slip one and queue position is at risk.
Public opposition
Substations, transmission, and large-scale renewables increasingly face organized opposition that requires structured engagement.
Coverage
Permits & approvals we handle
Coverage across generation, transmission, distribution, and storage.
Land use
- ·Conditional use permits
- ·Zoning amendments
- ·Variance applications
- ·Site plan review
Environmental
- ·NEPA EA / EIS
- ·State environmental review (CEQA, SEQRA)
- ·Wetlands / 404
- ·Endangered species consultation
Construction
- ·Building & grading
- ·Stormwater / SWPPP
- ·Air permits (gen-set, fugitive dust)
- ·Encroachment & ROW
Utility & regulatory
- ·FERC filings support
- ·PUC siting
- ·Interconnection process coordination
- ·Tariff / franchise
Both. We have separate practice leads for IOU and developer sides to avoid conflicts and tailor process expectations.
Protect your COD.
Send us your project portfolio. We'll respond within one business day with permitting risk and next steps.
Get a Quote